GFA, as a subcontractor
to URS Corporation or David Evans and Associates, has been providing
engineering services at the Knott Landfill since 1996. Prior to 1996,
Gerry Friesen provided engineering services as the Project Engineer for
Harding Lawson Associates.
Services that have been
provided include: analysis of development options; preparation of site
development plan and landfill operating plan; assistance in obtaining
regulatory agency approval for 2 lateral MSW landfill expansions;
development of an engineering report which analyzes an alternative liner
system, leachate management and surface water control system;
preparation of plans and specifications for the construction of Cell 1,
2 and 3; preparation of fill sequencing plans; preparation of a
construction quality assurance plan; contract management assistance; and
CQA certification.
In 1994, Deschutes County had less than 2
years of remaining disposal capacity at the Knott Landfill. A
partnering process was entered into by key representatives from the
County, DEQ and the design team. Gerry Friesen led the design team and
was responsible for analysis of development alternatives and providing
other engineering services that were needed.
Since that time, he has continued to be
the lead design engineer as the landfill has been expanded to include
135-acres and state-of-the-art liner systems, landfill gas control
systems and a leachate recirculation system. As a result of the
projects he has led, Deschutes County now has a landfill that has a
remaining site life of 30 years. |