Gerry Friesen, while working for HLA, prepared
the landfill’s initial site development plan, which outlines the development and
landfilling sequence to be followed through closure. The conceptual design
included a landfill operating plan and a plan for the future development of the
leachate, landfill gas, and surface water management systems.
Following ADEC approval of the conceptual design, Mr. Friesen
served as the designer and certifying engineer for Cell 1, 2, and 3. The
projects included more than 3 million cubic yards of excavation which was used
to construct a visual screening berm; a bird control system that limited birds
to fewer than 25 on the site; and over 40 acres of composite liners to control
leachate.
After opening and 2 years of operation, the landfill received SWANA’s award for technical excellence.